Zygo

3 Rod Kit

3 Rod Kit - Main image
$2114.45 $3253 In stock

Category: Zygo Certified Products

  • Description

Vertical Workstation Kit, 1.5 m

3 Rod Kit,     Tan base

This kit features 1.5 m rods and part stage 
The part stage is made up of a manual x-y stage, tip/tilt
accessory receptacle, and a manual z-axis.
Includes: three 1.5 m rods, baseplate, safety baseplate, two mounting
arms, and part stage

Ready to check out

Review the selected option and total at checkout.

Delivery to you

Allow time for the store to prepare your order before transit begins.

Standard Shipping: Handling (business days) 0–1; Transit (business days) 7–15.

Express Shipping: Handling (business days) 0–1; Transit (business days) 7–15.

View policy
Talking through a refund

Send the store your order number and the reason for your request.

Please contact us for the refund processing timeframe before returning an item.

View policy
Your shipping options

Choose from the delivery options available for your address.

Standard Shipping · United States: $0.00

Express Shipping · United States: $3.99

View policy
Before you return a product

Check the conditions for your product before sending it back.

United States · Return window (days after delivery): 30. Return method: By mail. Return postage: Seller pays.

View policy

Customer Reviews (4.4 / 5 · 5 reviews)

Timothy U. ★★★★★

The 1.5m rods are just the right length for my vertical workstation setup, and the tan base looks clean and professional on the bench. I’ve been using the manual x-axis on the part stage for fine adjustments, and it glides smoothly without any wobble. Really solid kit for the price.

Ellie ★★★★★

The part stage’s manual x-axis is smoother than I expected for a kit in this price range, and the 1.5 m rods give plenty of reach for my workbench setup. Took a little fiddling to align everything, but once it’s locked down, it holds position solidly.

Charlotte N. ★★★★★

The 1.5 m rods are exactly the length I needed for this vertical workstation setup, and the manual x-axis on the part stage is smooth and precise. Took me maybe twenty minutes to get everything aligned, but it’s been rock solid since.